This is my journey to build an Vans RV14 from plans. With the exception that I have later decided to order the RV14 Quick Build Wing. Building mostly alone I was worried about riveting well do to the large size of the wings.
Labels
13-16QBW
21-22QBW
Access Panel Installation
Aft Fuselage
Aft Fuselage Attachment
Aileron & Elevator Systems
Aileron Actuation
Aircraft Specialty
Antenna
Antisplat
Attachment
Avionics
Avionics Panel
B&C Filter
Baffle
Baggage Area
Bottom Wing Skins
Canopy and Window
Canopy harness
Common Fuselage Harness
Control Cables
Cowling
Deydrator
EICAD
Electrical
Eletric Aileron Trim
Elevator
ELT
Empennage
Empennage Fairings
Engine Installation
Exhaust
Exp119 Mods
finishing kit
Firewall
Flap Actuation System
Flap Position Sensor
Fuel and Oil System
Fuel System
Fuel Tank repair
Fuel Tanks
Fuselage
FWD Fuselage Lower Structure
FWD MID FUSE Side Structure
FWD MID Fuselage Bulkheads
FWF
GAP 26
Garmin AutoPilot Servos
Horizontal Stabilizer
Interior Topcoat
Landing Gear & Engine Mount
MID Fuselage Lower Structure
Miscellanea
Move
OP62
Outboard Leading Edge
Paint
parking brake
PitoStatic
Programming
QBW
QBW Corrosion
QBW Re-Work
Reiff
Roll Over Structure
Rudder
Rudder & Brake System
seatback's
shop
Skybolt
Spinner and Propeller
Testing
Upper FWD Fuselage
Vertical Stabilizer
Wheel Fairings
Wing Attachment
Wing Rebuild
Wing Systems Routing
Wing Tip
Wiring
Showing posts with label Baggage Area. Show all posts
Showing posts with label Baggage Area. Show all posts
Monday, March 30, 2020
Wednesday, March 4, 2020
Section 32 Baggage Area
RV14 Build February 22-23
Baggage Area
The baggage area is basically done excepts for the last few lines of solid rivets that I had some confusion on.
Getting ready to prime the parts.
Done with Priming
I started to countersink this and it looks symetrical, but it def is not! now a need to order a new part.
Not symmetrical
Starting to install the floors. I did a mix of trying to get into the cockpit and sit on the bulkheads and just leaning over the edge on a later to try and set all these pop rivets. For now Im going to leave of the seat back hinges till after top coating. The hinges are anodized metal already and I don't want the topcoat to interfere.
More progress.
Decided it would be easier to have the plans in the plane with me to see the rivet call outs.
One side is almost done.
Done!! I used the double bend 3/32 rivet set to get the rivets in the back of the floor boards.
The rivets that are highlighted are flush, except the plans don't have you dimple the baggage ride or rear wall??? Vans says a solid 470 rivet is fine or to drill them out to 1/8' and use the LP3-4 pop rivets.
Well this decision can wait for now, and Im out of 470-3-3 so Im going to pop rivet on the rest of the baggage area sides.
Baggage Area 9.0 Hours
Saturday, February 15, 2020
Section 32 Baggage Area
RV14 Build February 10
Baggage Area
Started moving forward on the baggage area. I installed the flap rod guides already and now making the seat back hinges.
I was extra careful with these, since I had a rough go of it with the cowling hinge when it came to riveting. I made sure to be as exact as I could to get them cut and the hole drilled in the correct location. Don't think this level of accuracy is super important, just dont want to find out the hard way.
Hinges cut and centerline drawn. I would recommend drawing the line on both sides.
When you cleko them on the line is on the opposite side of the baggage area floor holes and makes it impossible to match drill along them this way.
In the hole above "lot" you can see a line that a transferred to the other side.
I decided I wanted panel powered headset Lemo jacks. The floors dont come with them cut and they are a double D hole so I had to try and "make" the holes.
First I drilled with a bit that was close the .49" distance across.
Then I tried to be very careful with a Dremel cutter and form the holes from that. When the harness arrives ill see how close I came!
Baggage 9.0 Hours
Subscribe to:
Posts (Atom)
Before Start and First flight testing
R14 Build August & September 21 Testing Getting into the fun stuf!! Putting gas in for the first time. Have the airplane up to get 15 d...
-
I got to the shop everyday last week! I feel like I made a ton of progress. I finished the rework of the Vertical Stabiler parts that I had ...
-
R14 Build August & September 21 Testing Getting into the fun stuf!! Putting gas in for the first time. Have the airplane up to get 15 d...
-
Rv14 Build June 21 Air Vents The plans have you wait on the air vents till after the panel is in to make sure everything fits correctly. So...
-
RV14 Build June 21 FWF Wiring Reiff I wanted to install the full REIFF XP heater kit, but on the IO-390C sump there isn't a flat place ...
-
RV14 Build August 21 Canopy and Window I waited on the rear window install to make it easier to get in and out of the plane to work. Now th...
-
RV14 Build August 21 Avionics Install and Programming Now that the wings are on time to install the Pitot luckily I was smart enough to run...