RV14 Build July and August
13, 14, 15, & 16 QBW
These sections are suppose to be complete when you get the wings.
Section 13 Done
Section 14
Technically Complete, but i found from other people that the amount of wiring going into the wings made the smaller Snap bushing not work.
Per the plans I opened the 2 vertical holes in the first 8 ribs in the left wing to the larger SB500-6.



Section 15
I thought that this section was complete, but I found holes that need to be final drilled, although I used a reamer, and Countersunk.
Section 16
The top wing skins missed Countersinking the wing walk cover screw holes.
After countersinking the holes, I noticed the doubler under the skin to help with the wing walk support showed signs of cracking.
I called Vans, they said the wing walk doubler isn't structural for wing integrity, just there to help carry the weight of a person without denting the wing skins. Im hoping this cracks dont get worse, but for now they said not to worry about them.
This kit I tried to get all the metal that I thought I needed to drill, cut, shape done and prime all at one time. First I needed to remove the corrosion on the flanges and other random areas that came with the kit.
Normal prepping the metal for prime.Getting ready to spray
All primed!
13-16QBW 10.5 Hours

Normal prepping the metal for prime.Getting ready to spray
13-16QBW 10.5 Hours