RV14 Build March/April 21
Exp119 Mods
Starting off with the mods is the cowl flap or exhaust tunnel flap. Simple enough, gather the parts, prime, assemble.
Time to drill the nutplate locations.
The snorkel interferes with the cylinder 2 oil return line. So disconnected it for now.
After I fit the snorkel I realized the baffle was pushed out by the cylinder heater elements. So I removed the baffle and trimmed it. of course I had to start from the beginning on fitting the snorkel since everything shifted.
Finally a good fit.
Prime
Assemble
Adding nutplates and cushion clamps.
Drilling. The hard part is how do you dimple the skin. I pruchased a bit that fits into the rivet gun that will hold a dimple die and if I drill a hole into a bucking bar to hold the other end of the dimple die I can smash it into submission. Or I bought some oversized rivets/oops rivets for AN-2 with smaller heads than -3 that will just night a slight countersinking. still TBD.
Nutplate loctions.I was back and forth on adding another firewall pass through like the one above it or the special one that hold 2 cables. In the end I decided to use the special one with the kit.
Fitting the snorkel is detailed in the whole baffle section but here is the part that is OP62.
Drilled holes for clekoes and I fluxed the top abne bottom of the snorkel parts together.
Exp119 Mods 22.0 Hours