Its about to look like a taildragger! At first i didn't have the engine mount Vans has issues getting them produced so I did everything I could without it and then mounted it when it showed up.
First thing was to assembly the wheels
Next I cleaned the bearing of all the shipping grease and re packed them with Moble 28
New replacement bolt.
Here you can see the wood block that you make to help clamp the part together after you center it. I used a regular punch for this picture, but the drift pins above is what I really used to center and final drill. For the final drilling I used a reamer rather than a drill bit.
Next I had to repeat the process on the tail spring. I had primed the inside of the spring mount, that proved to be a problem now and had to sand out what I could to get the tail spring to fit in. The tape is just a visual so I would stop walking into it lol.
Last thing I could do is install bolts into the spare where the main gear would mount on a tricycle gear. The AN5 were too short to have threads showing to I replaced them, even though the nuts were jam nut size not shear so I don't think they are structural.
I tried to install the fittings for the brake caliper and messed up the threads. There must be a better wrench size for this. The second one was better, I just didn't try to tighten it as far, hopefully they dont leak.
Gera leg clamped in place before reaming. really this is after because I forgot to take the picture.
I used feeler gauges to find the gap.
.027 and .025 so both sides within the tolerance, no shims needed!
Wheels are installed. The hole for the cotter pin was so tight it was impossible to get it in. It seems like its a 1/8" so I opened it up to #30 and that works much better. Im not sure about the proper tightness of the axle nut though. At one cotter hole there is the slightest amount of play side to side in the wheel at the next there is definite friction on the rotation of the wheel. Asked Vans what is more important, still waiting on an answer.
Brake caliper is installed.
Man does she stand tall!
That basically rounds out the gear. I'm ordering brake leg hoses from aircraft specialty which the next section of the plans has you fabricate. I'll update the post when I install those.
Tail Dragger Gear & Engine Mount 16.5 hours