Thursday, September 12, 2019

Attachment of the Empennage components

RV14 Build September 12

Attachment 

Since Im still waiting on a bracket and the next kit I started to mess around with attaching the components today.

Doing this wasn't in the plans yet, but I wanted to see it all together!

Measured the bolt grip length and labeled them, also labeled the bags with the socket size. Should have done this a long time ago.


Vertical stabilizer Mounting plate is installed!

Just looks so good!

Installed the trim motor finally, now the Elevator section is technically done!

I thought this would be hared to get the rod end bearings close to the correct distance but it was relatively straight forward, the threats move it a lot with 1/2 a turn when you are close so its easy to tell where you should be.


Left Elevator installed on the horizontal Stabilizer!

Attachment 2.0 Hours