Monday, March 11, 2019

Shop March 10th

March 10th

Shop

I spent several hours today working on the shop. I wanted to get the shelve up and installed and remove all the cardboard boxes I had been using to protect the floor in the painting area and lay down some protective paper. The cardboard had to many cracks and opening so it was impossible to clean the dust out of that area.

Installed the second header board. This one I bought a 2X6 and 3" anchor bolts, it feels a lot more solid than the doubled up 2X4s.

Finished the shelf and loaded all the finished pieces as well as the longer fuselage parts. Making all the cuts with a battery powered circular saw is less than ideal. If I keep doing wood working Im going to need to buy a table say and a miter saw. Im thinking about trying to build some furniture pieces for me apartment so who knows...




Have the floor cleaned up and the paper down in the paint booth area.


 Decided to move the back shelving unit to the other was to clean up the space.


Shop 3.0 Hours